Choose tests that fit the equipment
Different equipment requires different test plans. Nameplate information, maintenance history, and the reason for the assessment help identify relevant measurements and establish working conditions.
Transformers, insulation, and grounding
Depending on the project, the scope may include transformer turns ratio, insulation resistance, winding resistance, or grounding measurements. Each test serves a different purpose, and results should be interpreted alongside equipment data and measurement conditions.
Plan the work and the documentation
The proposal should identify the equipment covered, access conditions, required switching arrangements, and deliverables. Scheduling also requires reviewing the available work window and coordinating with the facility representative.
Help us prepare your proposal
- Equipment type, quantity, and nameplate information.
- Reason for testing and available history.
- Site location, access, and available work window.
- Previous reports and requested deliverables.
Frequently asked questions
Can you prepare a quote from photos?
Nameplate and equipment photos help us prepare an initial proposal. Additional information or a review of site conditions may be needed.
Can one test determine the equipment’s overall condition?
Not necessarily. Each measurement provides specific information. Test selection and interpretation depend on the equipment, its history, and the assessment objective.

